Monday, May 14, 2012

05/14/2012 Day 36- Concrete pour stage 1

The guys from Burkett's were out today to begin the concrete pour. They began by pouring the retaining wall surrounding the property as well as the pool coping. These areas will need to dry for a couple of days before they pour the rest of the deck.
I also had Wade out from Dig and Demo to quote on tearing down the pool shed. He too was amazed that the city cited me for it and told me that it's common for them to turn a blind eye on this sort of thing. Should get the quote back tomorrow.

Hot Tub Area
Planter along width of property
Cantilever pool coping