Monday, May 7, 2012

05/07/2012 Day 29- Final prep for concrete pour

The guys were out to do the final prep to pour the concrete. The removed the planter on the south side of the lot so that the hot tub would slide right in rather than having to lift and drop it in. The final drainage and re-bar was also installed. Looks like we might actually pour this week.

The area around the hot tub
The walkway to the pool shed
The view from the walkway