I was able to check out the work that Burkett's did on re-routing the plumbing to accommodate the hot tub into the architecture. They've added 2x 3 way actuators that tie into the Pentair Suntouch controller that allows the water, filtration and heating to be routed to either the pool, or the hot tub depending on what's being used- automatically. With this system I can choose either gas or solar (or gas assisted solar) heating for either the pool or the hot tub. The water for both will flow through the Pentair salt water chlorinator so I'll never need to add chlorine again. I even added a wireless remote to be able to change from pool mode to spa mode on demand.
 |
| The wireless remote |
We should be getting the pool inspected today to go onto the plastering stage. Also, the hot tub gets moved into place tomorrow and I think I can start moving the patio furniture back in.
**UPDATE. Inspection passed. This allows Burkett's to plaster the pool on Monday and this also clears the bathroom and pool shed violation. The inspector will be coming in one last time post plaster job for a final final.
I got a lot of tips on this blog. I can now repair my pool equipment when they have a trouble. Thanks for this.
ReplyDeletepool equipment